Metropolitan Ring Road Oradea

The "Design and Execution - Metropolitan Ring Road Oradea Batch 2: KM 9+055 - KM 17+017" project, carried out in collaboration with SC PORR Construct SRL and the sub-beneficiary Bihor County Council, is a key element in the development of metropolitan infrastructure. Dromcons was responsible for designing an 8 km road, featuring 3 intersections, along with the necessary ancillary works.The geotechnical study involved drilling 51 boreholes, with depths reaching up to 25 m, to ensure a solid construction foundation. The project also included detailed topographic surveys, obtaining the required permits and authorizations, and comprehensive laboratory services.