Infrastructure projects are key interventions in the development of transport networks. They require careful planning, technical expertise, and flawless execution. In this section, we showcase five representative projects from the Dromcons portfolio, reflecting our commitment to quality and long-term impact.

Arad East Bypass, Metropolitan Ring Road Oradea

Arad East Bypass, Metropolitan Ring Road Oradea

1) Design and Execution Arad East Bypass

The "Design and Execution - Arad East Bypass" project, in partnership with SC PORR Construct SRL, for the sub-beneficiaries Arad County Council and C.N.A.A.I.R through D.R.D.P. Timișoara, represents a significant step in the development of regional road infrastructure. Dromcons provided design services and technical assistance for a road approximately 11 km long, featuring 7 intersections and various ancillary works. In addition, we conducted detailed topographic studies, obtained necessary permits and authorizations, and carried out a comprehensive geotechnical study, including 75 geotechnical drillings at varying depths.

2) Metropolitan Ring Road Oradea

The "Design and Execution - Metropolitan Ring Road Oradea Batch 2: KM 9+055 - KM 17+017" project, carried out in collaboration with SC PORR Construct SRL and the sub-beneficiary Bihor County Council, is a key element in the development of metropolitan infrastructure. Dromcons was responsible for designing an 8 km road, featuring 3 intersections, along with the necessary ancillary works.The geotechnical study involved drilling 51 boreholes, with depths reaching up to 25 m, to ensure a solid construction foundation. The project also included detailed topographic surveys, obtaining the required permits and authorizations, and comprehensive laboratory services.

DN14A Bridge Works Blajel, Modernization of the railway Caransebes – Timisoara – Arad, Highway A13

3) DN14A Bridge Works Blajel

The project "Design and Execution of Bridge Works on DN14A KM 7+466 Blajel", executed in partnership with GEIGER Transilvania SRL, marks a crucial step in enhancing the local road infrastructure.The Dromcons team conducted a comprehensive geotechnical study, including medium-depth boreholes, shallow boreholes, and super-heavy dynamic penetrations, to ensure the bridge’s stability and durability. Detailed topographic surveys were also performed, alongside full design and technical assistance services, guaranteeing accurate and efficient execution of the works.

4) Modernization of the railway Caransebes –  Timisoara – Arad

During the project "Modernization of the CF Line Caransebes - Timisoara - Arad, Batches 3 and 4, Rona Triaj Gr. D - ARAD" in collaboration with WEBUILD SPA Milano, Romanian Branch, Dromcons provided a comprehensive range of  services. Our expertise added significant value to this complex undertaking, ensuring compliance with industry standards and facilitating project progress. The Dromcons team was responsible for obtaining the Building Authorization for the Organization of the Construction Site for the "Modernization of the Railway Caransebes - Timisoara - Arad, Lot 4 Rona Triaj Gr. D - ARAD" project, in collaboration with WEBUILD SPA Milano. This phase involved securing approvals and permits, as well as providing design services as part of a single package, ensuring optimal and sustainable technical solutions for the project.

DN14A Bridge Works Blajel, Modernization of the railway Caransebes –  Timisoara – Arad, Highway A13
Highway A13

Highway A13

5) Highway A13 Drilling and Geotechnical Investigations

In partnership with MAKYOL ISTANBUL - SUCURSALA BUCUREȘTI, Dromcons plays a crucial role in the development of road infrastructure planned by CNAIR for the coming years. The "Design and Execution of the Sibiu - Făgăraș Highway, Batches 1, 2, 3, and 4" project provided an opportunity to showcase our expertise in large infrastructure works, with a particular focus on drilling and geotechnical studies. For this project, Dromcons conducted complex geotechnical drilling, collecting disturbed and undisturbed samples at depths of up to 80 meters. Our activities also included borehole mapping and visual documentation, soil testing using dynamic heavy penetration (DPH) and standard penetration testing (SPT) methods, as well as water sampling and analysis.

Portofolio infrastructure projects